Monday, May 16, 2011

Latest Set of Proposed Plans

The Long Range Planning Committee has been working with RKtects Studios, the architectural firm retained by Overlee to assist with the major renovation project, to refine the master site plan that was presented to and approved by the Overlee general membership at the annual meeting that was held on February 9, 2011. The latest master site plan can be viewed by clicking on this link: site plan. Since the February meeting, the changes to the master site plan have been driven primarily by two general factors: (1) the desire to preserve as many of the healthy mature trees on the Overlee property as possible based on an extensive tree survey and analysis performed by an arborist retained by Overlee, and (2) to comply with the latest applicable laws and regulations, namely those pertaining to handicapped access and storm and sewer management.

We have also posted on this same link draft exterior and floorplan designs for the new clubhouse. The exterior designs include a view of the proposed clubhouse from each of four directions. Although the designs are still in draft form and yet to be finalized, they incorporate many of the suggestions and comments that have been provided by members of the Overlee Board of Directors, the Long Range Planning Committee, and the Overlee community in general. Please direct any comments you might have concerning the clubhouse to clubhousecommitte@overlee.org or the renovation generally to planning@overlee.org.

The entire set of proposed plans:

Friday, February 11, 2011

Construction Project Approved

At the Overlee Community Association's annual meeting on Wednesday, the membership approved moving forward with a renovation plan that will include a new main pool, tank and baby pools, a clubhouse, deck and terrace, and associated roads and landscaping improvements to the Association's property. The members present voted 55-4 to accept the recommendation [C-2] developed by the Association's Long Range Planning Committee and Board of Directors, committees comprised of volunteer Overlee members who devoted hundreds of hours to developing the proposal. The recommendation was discussed in a two-hour presentation and Q & A session prior to the vote. Materials discussing the recommendation were also available on the http://overlee-pool.blogspot.com/ and had been discussed in membership meetings throughout the year. Overlee members are invited to check the Overlee blog frequently for information updates and to submit their questions, comments and ideas.

Wednesday, January 26, 2011

Master Plan Scope Summary and Budget

The following Master Plan Scope Summary and Budget was prepared by RKtects Studio, the architectural firm retained by Overlee to advise on the proposed capital project and develop alternative site plans, to summarize the key features of each of the three final site plan options considered by the Long Range Planning Committee (LPRC) and the preliminary total estimated cost of each. The Maintenance Upgrades option consists essentially of maintaining the status quo in terms of not changing the existing site plan, altering the location of individual features or adding any new amenities. Instead, the Maintenance Upgrades option contemplates replacing the main pool exactly as it currently is (i.e. same footprint, no additional features) and performing all of the long-deferred but now crucial maintenance and renovations on the existing clubhouse, decks, roads and parking lots, and addressing the drainage, retaining wall and fencing issues around the property as described in the Project Considerations presentation contained on this Overlee construction blog. Such presentation was made to Overlee members at the November 3, 2010, general membership meeting. Diagrams and accompanying descriptions of Scheme A/B-2 and Scheme C-2 can be found on this blog under the headings "Option A/B-2" and "Option C-2," respectively.

RKtects developed the cost estimates by applying the same standard industry unit cost measures to all three options, thus enabling the reader to make a high level "apples to apples" comparison of the relative projected costs of each scheme. However, two important caveats should be noted. First, the cost estimates are initial high level estimates that are intended more to serve comparative and scale purposes than as precise calculations of likely final actual costs. In this respect, the estimated cost of the selected option will be continually refined as the details of each aspect of the project are developed. Second and consistent with the first caveat, the cost estimates do not reflect the current favorable market conditions.

With these caveats in mind, the LRPC and the Overlee Board have relied on these preliminary cost estimates to arrive at certain general conclusions that have factored into the final selection of Scheme C-2 as the recommended option that will be presented to the Overlee membership for approval at the February 9, 2011, general membership meeting. First, Overlee will incur a substantial cost even if it does not alter its existing site plan at all and makes only the necessary replacement of the main pool and performs the long-deferred renovations and maintenance of the clubhouse and other features of the Overlee property. In some ways, the Maintenance Upgrades cost estimate masks the likely longer term aggregate costs of keeping the status quo due to the subsequent ongoing costs of retaining and maintaining certain aged facilities. Second, the option that involves the retention and renovation of a portion of the existing clubhouse (Scheme A/B-2) will result in a significantly higher cost than the option that calls for replacing the structure with a new single multi-story and multi-use building (Scheme C-2). Third, Overlee can, through a combination of savings, the levying of a special fee and borrowings, and the continued application of judicious financial management, afford invest in its future and adopt a new site plan that makes better use of its property and includes new pools, deck space and clubhouse with additional features and amenities in each. This will enable Overlee to better serve its members over the coming decades.

Click here for the Master Plan Scope Summary and Budget

Monday, November 8, 2010

Presentation Material from the 11/3/10 Membership Meeting

Missing presentation documents added on 11/17/2010


Thanks to everyone that came to the membership meeting to give feedback on the options for the new pool and building construction project.  Below are the materials presented at the meeting.  Please provide your opinions in the comments section below.


Thursday, September 23, 2010

Revised Design Concepts

The architects from The RKtects Studio delivered the first site design concepts this week.

Click links below to see each drawing.  Your comments and opinions on each design are appreciated.

Drawings:

Wednesday, September 22, 2010

Wednesday, September 1, 2010

Overlee Construction Project FAQ from July Newsletter

Anyone who has spent some time at the pool this summer has probably heard talk about some impending major changes at Overlee. To separate myth from fact and as part of the Overlee Board’s ongoing efforts to keep the membership informed of significant upcoming developments relating to the main pool and the overall Overlee property, we have put together the following of FAQs.

Click to see the complete FAQ

Wednesday, August 18, 2010

June 2010 Request for Site Plan Proposals

In June 2010, the Overlee Board solicited proposals from Architecture/Engineering firms, etc.  Attached is the full RFP that was sent out.  Four proposals were received; two firms were brought in for oral presentations, and the firm of RKTechts was selected.

Click to read the RFP